Till innehåll på sidan
Till KTH:s startsida

Tidskrifter

Tidskrifter

[2]
T. A. Pham, R. Akan och A. Tabaroei, "A simplified soil–structure interaction model for load–settlement analysis of piles," Canadian geotechnical journal (Print), vol. 62, 2025.
[3]
T. A. Pham et al., "Critical state mechanics-based arching model for pile-supported embankments," Geotextiles and Geomembranes, vol. 53, no. 4, s. 909-937, 2025.
[4]
A. Tabaroei et al., "Deep Excavation–Induced Stability Evaluation of a Triple Tunnel Using Discrete and Continuum Numerical Modeling," International Journal of Geomechanics, vol. 25, no. 1, 2025.
[6]
A. G. Corkum, B. Jeans och D. Mas Ivars, "Leeb hardness test as a tool for joint wall compressive strength (JCS) evaluation," Engineering Geology, vol. 344, 2025.
[8]
W. Hua, C. Wersäll och S. Larsson, "Packningskontroll för framtiden : Medern teknik i stället för långsamma försök," Bygg och Teknik, no. 1, s. 24-27, 2025.
[9]
H. Farajollahi, M. Mohammadi och M. H. Khosravi, "The Applicability of Rock Bolt Supporting Factor based on Rock Mass Behavior: A Case Study of Alborz Tunnel," Journal of Mining and Environment, vol. 16, no. 2, s. 599-611, 2025.
[10]
A. Abbaszadeh Shahri, C. Shan och S. Larsson, "A hybrid ensemble-based automated deep learning approach to generate 3D geo-models and uncertainty analysis," Engineering with Computers, vol. 40, no. 3, s. 1501-1516, 2024.
[11]
E. Olsson et al., "A numerical framework for modelling settlements of railway ballast layers," TRANSPORTATION GEOTECHNICS, vol. 44, 2024.
[12]
J. Y. Gui et al., "Analytical and experimental studies on toppling behavior of blocks misaligned with the slope face," Bulletin of Engineering Geology and the Environment, vol. 83, no. 4, 2024.
[15]
T. A. Pham, S. Nadimi och M. Sutman, "Critical Review of Physical-Mechanical Principles in Geostructure-Soil Interface Mechanics," Geotechnical and Geological Engineering, vol. 42, no. 8, s. 6757-6808, 2024.
[17]
S. Libby et al., "Exploring the impact of fracture interaction on connectivity and flow channelling using grown fracture networks," Quarterly journal of engineering geology and hydrogeology, vol. 57, no. 1, 2024.
[18]
L. Zou, D. M. Ivars och V. Cvetkovic, "Impact of multiscale surface roughness on shear behavior of rock fractures," Tunnelling and Underground Space Technology, vol. 153, 2024.
[19]
A. Ahmad, C. Wersäll och S. Larsson, "Impact of particle arrangement and model dimensions on DEM modeling of high-speed railway ballasted tracks in 2D and 3D," Transportation Geotechnics, vol. 47, 2024.
[21]
I. Samuelsson, J. Spross och S. Larsson, "Integrating life-cycle environmental impact and costs into geotechnical design," Proceedings of the Institution of Civil Engineers : Engineering Sustainability, vol. 177, s. 19-30, 2024.
[22]
M. Mohammadi och J. Spross, "Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects," Geotechnical and Geological Engineering, vol. 42, no. 2, s. 1445-1457, 2024.
[23]
[25]
E. Bismut et al., "Optimal adaptive decision rules in geotechnical construction considering uncertainty," Geotechnique, vol. 74, no. 13, s. 1622-1633, 2024.
[26]
M. Mohammadi och J. Spross, "Probabilistic time estimation of tunnels constructed with multiple headings," Tunnelling and Underground Space Technology, vol. 153, 2024.
[27]
D. R. Damasceno, J. Spross och F. Johansson, "Reliability-based design tool for gas storage in lined rock caverns," Georisk : Assessment and Management of Risk for Engineered Systems and Geohazards, vol. 18, s. 410-422, 2024.
[28]
M. A. González-Fernández et al., "Size effects on strength and deformability of artificially jointed hard rock," International Journal of Rock Mechanics And Mining Sciences, vol. 176, 2024.
[30]
J. Gui et al., "Stability against toppling of a single rock block resting on an irregular rough base," Environmental Earth Sciences, vol. 83, no. 23, 2024.
[31]
M. C. Saceanu et al., "Thermo-mechanical modelling of spalling around the deposition boreholes in an underground nuclear waste repository during its thermal phase," International Journal of Rock Mechanics And Mining Sciences, vol. 183, 2024.
[32]
J. Spross, "Uncertainty, Modeling, and Decision Making in Geotechnics," Structural Safety, vol. 109, 2024.
[34]
J. Larsson et al., "A novel method for geometric quality assurance of rock joint replicas in direct shear testing - Part 2 : Validation and mechanical replicability," Journal of Rock Mechanics and Geotechnical Engineering, vol. 15, no. 9, s. 2209-2223, 2023.
[36]
D. Doolaeghe et al., "Controls on fracture openness and reactivation in Forsmark, Sweden," Scientific Reports, vol. 13, no. 1, 2023.
[37]
J. Stener et al., "Dimensionering av korta pålar – pelare eller pålar med sidomotstånd?," Bygg och Teknik, no. 1, s. 20-23, 2023.
[38]
D. R. Damasceno, J. Spross och F. Johansson, "Effect of rock joints on lined rock caverns subjected to high internal gas pressure," Journal of Rock Mechanics and Geotechnical Engineering, vol. 15, no. 7, s. 1625-1635, 2023.
[40]
S. De Simone et al., "Equivalent Biot and Skempton Poroelastic Coefficients for a Fractured Rock Mass from a DFN Approach," Rock Mechanics and Rock Engineering, vol. 56, no. 12, s. 8907-8925, 2023.
[41]
J. Lidmar et al., "Estimation of small failure probabilities using the Accelerated Weight Histogram method," Probabilistic Engineering Mechanics, vol. 74, 2023.
[42]
I. Samuelsson et al., "Geoteknik ur ett livscykelperspektiv," Husbyggaren, no. 1, s. 17-20, 2023.
[43]
E. Ehrmanntraut, C. Wersäll och K. R. Massarsch, "Identification of Soil Layers and Properties by Vibration Measurements during Dynamic Penetration Testing," ASTM geotechnical testing journal, vol. 46, no. 2, 2023.
[44]
J. Spross, T. Gasch och F. Johansson, "Implementation of reliability-based thresholds to excavation of shotcrete-supported rock tunnels," Georisk : Assessment and Management of Risk for Engineered Systems and Geohazards, vol. 17, no. 2, s. 361-375, 2023.
[45]
P. Teng, F. Johansson och J. G. I. Hellstrom, "Modelling erosion of a single rock block using a coupled CFD-DEM approach," Journal of Rock Mechanics and Geotechnical Engineering, vol. 15, no. 9, s. 2375-2387, 2023.
[46]
X. Guo, T. A. Pham och D. Dias, "Multi-objective optimization of geosynthetic-reinforced and pile-supported embankments," Acta Geotechnica, vol. 18, no. 7, s. 3783-3798, 2023.
[47]
L. Olsson, J. Spross och O. Båtelsson, "Nytt verktyg hjälper till att strukturera riskerna," Bygg och Teknik, vol. 115, no. 1, s. 34-39, 2023.
[48]
M. Tidlund, J. Spross och S. Larsson, "Observational method as risk management tool : the Hvalfjörður tunnel project, Iceland," Georisk : Assessment and Management of Risk for Engineered Systems and Geohazards, vol. 17, no. 2, s. 346-360, 2023.
[49]
A. Ulfberg et al., "Probabilistic finite element analysis of failures in concrete dams with large asperities in the rock-concrete interface," ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, vol. 23, no. 2, 2023.
[50]
M. Mohammadi, J. Spross och H. Stille, "Probabilistic Time Estimation of Tunneling Projects : The Uri Headrace Tunnel," Rock Mechanics and Rock Engineering, vol. 56, no. 1, s. 703-717, 2023.
Fullständig lista i KTH:s publikationsportal
Innehållsansvarig:admin@byv.kth.se
Tillhör: Institutionen för byggvetenskap
Senast ändrad: 2022-02-25